Prepare pipe passages

Self-adhesive wall sealing set for dry sealing walls and floors.

1 Sealing membrane 1 m x 30 m; 2 Spray primer; 3 Corner adhesive tape 120 mm x 50 m; 4 Plinth sealing tape 50 m;
5 Installation aid: squeegee; 6 2x wall sleeves 1/2″; 7 Drip protection sleeve; 8 Installation instructions.

Prepare sealing for pipe penetrations and stick on sealing sheets

1. stick a strip of corner adhesive tape with trowel protection strip over the sealing sleeves. It ensures the secure connection of the remaining sealing membrane (D7) at the bottom.

2. the passes for the
Cut out the building plugs.

3. screw in the construction plugs.

4 Starting from the center of the corner adhesive tape, mark the sealing strip 20 mm upwards above the pipe passages and cut off the sealing strip.

5. place the rest of the sealing strip at 20 mm below the center of the corner adhesive tape and stick it down to the floor.

6. cut off the sealing strip in the throat of the corner adhesive tape. Dichbahnfest rolls up.

7. apply a saturated coat of spray primer to the area of the trowel protection and fleece of the sealing membrane.

8. the next sealing strip is docked on.

DO NOT MISS ANY NEWS

By clicking you accept the terms of use and the privacy policy.
EXCITING PRODUCTS
0 +
ASSORTMENTS
0 +

#Frag Andreas

Wir helfen Ihnen bei allen Fragen rund um unsere Produkte und antworten Ihnen während unserer Geschäftszeiten umgehend.

#Question Andreas

We will help you with any questions you may have about our products and will respond promptly during our business hours.